One step forward, two steps back. Today was one of those days. After we spent several days prepping the pad for the shop, it was determined that due to soil instability around the edges, it would be better to do a two stage pour instead of a monolithic pour. This requires a ditch for footings all the way around the pad. That adds up to a little more than 200 feet of ditch, and a lot of wasted time and effort. Something tells me that this won't be the last setback we'll see on this project.